Design specification for river - bank spillway 溢洪道設(shè)計規(guī)范
Taken the bank spillway at yubeishan reservoir as an example , the water loads acted on the spillway , such as static water pressure , dynamic water pressure , shear stress on the surface of the step and so on , are calculated , which can provide evidence to the stability analysis of the dam slope and slope protection 并以萬縣魚背山水庫岸邊溢洪道為例,計算了溢洪道上所受的水流荷載及其分布,為土石壩坡和護面的穩(wěn)定分析提供了依據(jù)。通過計算證實了既使在較大的單寬流量下,緩坡上的階梯仍有較高的消能率。